13 facilities: 10 operational, 1 under construction, 2 planned. Data as at 2 November 2026.

Cite this map: Certified Strategic, “Western Australia Data Centre Infrastructure Map”, 22 October 2026, updated 14 November 2026. certifiedstrategic.com/maps/western-australia

All Western Australia data centres tracked

The facilities on the map above, as a list. Operator names link through to their Certified Strategic profile, or to their listing in the directory.

FacilityOperator, suburbMW, status
Malaga Data CentreFujitsu Australia
Malaga
10 MW
Operational
P2 PerthNEXTDC
Perth
6 MW
Operational
P1 PerthNEXTDC
Malaga
5.5 MW
Operational
NE1 NewmanNEXTDC
Newman
1 MW
Operational
PH1 Port HedlandNEXTDC
Port Hedland
1 MW
Operational
PE1Equinix
East Perth
Capacity not published
Operational
PE2Equinix
Shenton Park
Capacity not published
Operational
PE3Equinix
Shenton Park
Capacity not published
Operational
Perth Data Centre (Wellington)Telstra InfraCo
Perth
Capacity not published
Operational
Pier DCDC Alliance
Canning Vale
Capacity not published
Operational
Maddington campusCDC Data Centres
Maddington
145 MW
basis not stated
Under construction
Project Meridien (Meridien Renewable Energy Hub and Data Centre)Gingerah Energy
La Grange, Shire of Broome
1,000 MW
Planned
Hazelmere data centreCDC Data Centres
Hazelmere
Capacity not published
Planned

Substations on this map

Figures are as each network publishes them. Networks rarely publish spare capacity, so cells without a published figure say not published.

SubstationNetworkFirm rating (N-1)Peak demandNetwork's own figureSource
Northern TerminalNot recordednot publishednot publishednot publishednot published
Wellington StreetNot recordednot publishednot publishednot publishednot published
East Perth TerminalNot recordednot publishednot publishednot publishednot published
Western TerminalNot recordednot publishednot publishednot publishednot published
MaddingtonWestern Powernot publishednot publishedLess than 5 MVA (Forecast remaining capacity, 2026)Western Power Network Capacity Mapping Tool, 8 January 2026
Kenwick LinkNot recordednot publishednot publishednot publishednot published
GuildfordNot recordednot publishednot publishednot publishednot published
CanningvaleWestern Powernot publishednot published15 to 20 MVA (Forecast remaining capacity, 2026)Western Power Network Capacity Mapping Tool, 8 January 2026
WedgefieldNot recordednot publishednot publishednot publishednot published
NewmanNot recordednot publishednot publishednot publishednot published
Three Springs TerminalNot recordednot publishednot publishednot publishednot published

Changes since October 2026

  1. Western Power's forecast remaining capacity bands added for the Maddington and Canning Vale substations. Source

About This Map

This map tracks data centres across Western Australia, the subsea cables that land at Perth and Port Hedland, and the grid behind them. Capacity is shown with the measure its source uses, and sites without a published figure are marked "Capacity not published".

Records come from operator announcements and ASX releases, council and development assessment panel registers, federal environment referrals, cable owners' announcements and Geoscience Australia's electricity infrastructure data. Each record carries the source it came from.

The map is refreshed on the first business day of each month, and the date above the map is the date the data was last checked, not the date you opened the page.

Map researched and maintained by CertifiedStrategic.com.

Power lines and power stations: © Commonwealth of Australia (Geoscience Australia) 2026, Electricity Infrastructure, CC BY 4.0

Related Analysis

Australian data centre capacity: the 2026 to 2030 guide

Plan for a 1GW data centre south of Broome opens for comment

Where in WA can an AI data centre be built?

Vocus cable break leaves both of Perth's Singapore routes down

Micro data centres make a comeback, and one state is best placed

Sharon AI eyes Frontier Energy solar stake before ASX debut

Vocus quadruples its Adelaide-Perth fibre capacity for AI

A sub-cent Singapore microcap is bidding for control of Perth’s Pier DC

Australia's 15 subsea cables and three ACMA protection zones: what Marles' Shangri-La 2026 speech reveals

Using our data: read the licence and attribution terms.

Capacity

Australian capacity requirements

For neoclouds, AI labs and enterprises planning an Australian deployment. We shortlist sites against your GPU platform, scale, market and ready-for-service date. Operators with capacity coming online are welcome to get in touch.

Connect on LinkedIn