Western Australia Data Centre Infrastructure Map
13 facilities: 10 operational, 1 under construction, 2 planned. Data as at 2 November 2026.
Cite this map: Certified Strategic, “Western Australia Data Centre Infrastructure Map”, 22 October 2026, updated 14 November 2026. certifiedstrategic.com/maps/western-australia
All Western Australia data centres tracked
The facilities on the map above, as a list. Operator names link through to their Certified Strategic profile, or to their listing in the directory.
| Facility | Operator, suburb | MW, status |
|---|---|---|
| Malaga Data Centre | Fujitsu Australia Malaga | 10 MW Operational |
| P2 Perth | NEXTDC Perth | 6 MW Operational |
| P1 Perth | NEXTDC Malaga | 5.5 MW Operational |
| NE1 Newman | NEXTDC Newman | 1 MW Operational |
| PH1 Port Hedland | NEXTDC Port Hedland | 1 MW Operational |
| PE1 | Equinix East Perth | Capacity not published Operational |
| PE2 | Equinix Shenton Park | Capacity not published Operational |
| PE3 | Equinix Shenton Park | Capacity not published Operational |
| Perth Data Centre (Wellington) | Telstra InfraCo Perth | Capacity not published Operational |
| Pier DC | DC Alliance Canning Vale | Capacity not published Operational |
| Maddington campus | CDC Data Centres Maddington | 145 MW basis not stated Under construction |
| Project Meridien (Meridien Renewable Energy Hub and Data Centre) | Gingerah Energy La Grange, Shire of Broome | 1,000 MW Planned |
| Hazelmere data centre | CDC Data Centres Hazelmere | Capacity not published Planned |
Substations on this map
Figures are as each network publishes them. Networks rarely publish spare capacity, so cells without a published figure say not published.
| Substation | Network | Firm rating (N-1) | Peak demand | Network's own figure | Source |
|---|---|---|---|---|---|
| Northern Terminal | Not recorded | not published | not published | not published | not published |
| Wellington Street | Not recorded | not published | not published | not published | not published |
| East Perth Terminal | Not recorded | not published | not published | not published | not published |
| Western Terminal | Not recorded | not published | not published | not published | not published |
| Maddington | Western Power | not published | not published | Less than 5 MVA (Forecast remaining capacity, 2026) | Western Power Network Capacity Mapping Tool, 8 January 2026 |
| Kenwick Link | Not recorded | not published | not published | not published | not published |
| Guildford | Not recorded | not published | not published | not published | not published |
| Canningvale | Western Power | not published | not published | 15 to 20 MVA (Forecast remaining capacity, 2026) | Western Power Network Capacity Mapping Tool, 8 January 2026 |
| Wedgefield | Not recorded | not published | not published | not published | not published |
| Newman | Not recorded | not published | not published | not published | not published |
| Three Springs Terminal | Not recorded | not published | not published | not published | not published |
Changes since October 2026
- Western Power's forecast remaining capacity bands added for the Maddington and Canning Vale substations. Source
About This Map
This map tracks data centres across Western Australia, the subsea cables that land at Perth and Port Hedland, and the grid behind them. Capacity is shown with the measure its source uses, and sites without a published figure are marked "Capacity not published".
Records come from operator announcements and ASX releases, council and development assessment panel registers, federal environment referrals, cable owners' announcements and Geoscience Australia's electricity infrastructure data. Each record carries the source it came from.
The map is refreshed on the first business day of each month, and the date above the map is the date the data was last checked, not the date you opened the page.
Map researched and maintained by CertifiedStrategic.com.
Power lines and power stations: © Commonwealth of Australia (Geoscience Australia) 2026, Electricity Infrastructure, CC BY 4.0
Related Analysis
Australian data centre capacity: the 2026 to 2030 guide
Plan for a 1GW data centre south of Broome opens for comment
Where in WA can an AI data centre be built?
Vocus cable break leaves both of Perth's Singapore routes down
Micro data centres make a comeback, and one state is best placed
Sharon AI eyes Frontier Energy solar stake before ASX debut
Vocus quadruples its Adelaide-Perth fibre capacity for AI
A sub-cent Singapore microcap is bidding for control of Perth’s Pier DC
Using our data: read the licence and attribution terms.