Japan Data Centre Infrastructure Map

41 facilities: 22 operational, 8 under construction, 9 planned, 2 not confirmed. Data as at 14 November 2026.

Cite this map: Certified Strategic, “Japan Data Centre Infrastructure Map”, 14 November 2026, updated 14 November 2026. certifiedstrategic.com/maps/japan

All Japan data centres tracked

FacilityOperator, suburbMW, status
TOK1 Tokyo EastAirTrunk
Inzai, Chiba
300 MW
Total campus capacity at full build-out
Operational
Cosmosquare Data Centre campusESR
Suminoe, Osaka City
130 MW
Facility load, campus (three phases)
Operational
NRT campusMC Digital Realty
Inzai, Chiba
120 MW
Planned IT load, campus total with future buildings, over 120MW
Operational
TOK2 Tokyo WestAirTrunk
West Tokyo
110 MW
Total campus capacity at full build-out
Operational
Telehouse Tokyo Tama campusKDDI (Telehouse)
Tama, Tokyo
100 MW
Total power receiving capacity, Tama area, up to
Operational
TY1Princeton Digital Group
Saitama City, Saitama
96 MW
Operational
KIX campusMC Digital Realty
Minoh and Ibaraki, Osaka
74 MW
Planned IT load, campus total, over 74MW
Operational
Tokyo campus (TYO1, TYO2)STT GDC
Inzai, Chiba
70.8 MW
Operational
Tokyo Inzai campus (Inzai 1 to 4)Colt DCS
Inzai, Chiba
70 MW
Our sum of four buildings' IT load
Operational
TY12xEquinix xScale
Inzai, Chiba
54 MW
Operational
Fuchu data centreSoftBank
Fuchu, Tokyo
50 MW
Maximum power receiving capacity
Operational
Osaka Sakai Data CenterKDDI
Sakai, Osaka
50 MW
Maximum power receiving capacity, approximate (press report)
Operational
Shiroi Data Center CampusIIJ
Shiroi, Chiba
50 MW
Power receiving capacity, campus
Operational
Osaka KeihannaColt DCS
Keihanna Science City
45 MW
Operational
TY13xEquinix xScale
Inzai, Chiba
36 MW
Operational
Keihanna OSK11NTT DATA
Seika, Kyoto
30 MW
Operational
OSK1 Osaka WestAirTrunk
West Osaka
20 MW
Total capacity, measure not stated
Operational
Ishikari Renewable Energy Data Center No.1Ishikari Saiene Data Center No.1 GK
Ishikari, Hokkaido
15 MW
Power receiving capacity
Operational
OS2x and OS4xEquinix xScale
Minoh, Osaka
14.4 MW
Operational
Inzai data centerGoogle
Inzai, Chiba
Capacity not published
Operational
Ishikari Data CenterSakura Internet
Ishikari, Hokkaido
Capacity not published
Operational
Kitakyushu Data Center (Asian Frontier)SoftBank
Yahatahigashi, Kitakyushu
Capacity not published
Operational
Tsukuba Tech Central (TYO05)Goodman
Tsukuba, Ibaraki
1,000 MW
Total campus power (first building 50MW)
Under construction
Osaka Sakai AI Data CenterSoftBank
Sakai, Osaka
140 MW
Power receiving capacity
Under construction
Hibikino data centre campusAsia Pacific Land and Global Compute Infrastructure
Wakamatsu, Kitakyushu
120 MW
Total power load, two buildings
Under construction
Tochigi TCG11NTT DATA
Tochigi Prefecture
100 MW
Under construction
Hokkaido Tomakomai AI Data CenterSoftBank
Tomakomai, Hokkaido
50 MW
Power receiving capacity, first data hall building
Under construction
Tokyo TKY11NTT DATA
Shiroi, Chiba
50 MW
Under construction
OSK1 KeihannaCyrusOne KEP
Keihanna
48 MW
Under construction
TK1 TokyoNEXTDC
Minato, Tokyo
30 MW
Under construction
AI data centre at Circular Park KyushuKai Shin Digital Infrastructure
Satsumasendai, Kagoshima
350 MW
Cumulative after staged expansion, measure not stated
Planned
Itoshima data centre campusAsia Pacific Land
Itoshima, Fukuoka
300 MW
Measure not stated
Planned
Imari campusDayOne
Imari, Saga
200 MW
Grid power (160MW secured)
Planned
Tokyo TKY12NTT DATA
Shiroi, Chiba
200 MW
Planned
Minoh hyperscale siteESR and Colt DCS
Minoh, Osaka
130 MW
Facility load, whole site (first phase 65MW)
Planned
Osaka OSK12NTT DATA
Ibaraki, Osaka
36 MW
Planned
Tokyo Inzai 5Colt DCS
Inzai, Chiba
32 MW
Planned
Hakata Data CenterNTT West
Hakata, Fukuoka City
5 MW
Planned
Sagamihara data centre campusGoodman
Sagamihara, Kanagawa
Capacity not published
Planned
KIX01 KeihannaSTACK Infrastructure
Keihanna
72 MW
Campus, measure not stated
Not confirmed
TKY01 InzaiSTACK Infrastructure
Inzai, Chiba
36 MW
Campus, measure not stated (two 18MW buildings)
Not confirmed

Not on the map: OSK2 Osaka Downtown East, AirTrunk, East Osaka, location not published. Planned, 100 MW (Total campus IT load, up to). Other figure: 50+MW, measure not stated (AirTrunk OSK2 page). Source

Government data centre regions

On 11 September 2026 Japan's Ministry of Economy, Trade and Industry (METI) certified nine regions, at ten points, as data centre clusters in its first round of GX strategic regions. Boundaries and plans are not published yet, so the map marks each named town.

15 towns: Ishikari, Tomakomai, Akita, Tomiya, Yaita, Joso, Tsukuba, Nanto, Ayagawa, Sakaide, Marugame, Kitakyushu, Nogata, Kurate, Satsumasendai.

Cables to Australia

Two cable routes link Japan and Australia today, both through Guam. The map draws them as straight dashed lines between landing points: an indicative route, not the path on the seabed.

  • Australia-Japan Cable (AJC) In service since December 2001, according to its owner. Lands at Shima and Maruyama in Japan, Tanguisson and Tumon Bay in Guam, and Oxford Falls and Paddington in Sydney. Drawn as straight lines through Guam: an indicative route, not the path on the seabed. The Japanese ends are town points, not the stations. Source
  • Japan-Guam-Australia (JGA) Two cables joined at Piti, Guam: JGA North from Minami-Boso (completed July 2020) and JGA South to Sydney, with a branch to Maroochydore (in service March 2020). Lightstorm now owns JGA North and significant portions of JGA South. Drawn as straight lines: an indicative route, not the path on the seabed. Source
  • APX North (SUBCO) SUBCO announced APX North on 22 September 2026: 9,500km from Sydney to Japan via Guam, with some fibre pairs bypassing Guam, targeted for 2029. Its landing sites are not published yet, so it is not drawn. Source

Changes since October 2026

  1. Japan map added. Source

About This Map

This map is a special: it looks past Australia to Japan, where Australian operators AirTrunk, Goodman and NEXTDC are building. It tracks data centre campuses from Hokkaido to Kyushu, the two subsea cable routes that link Japan and Australia through Guam, and the towns in Japan's new government data centre regions. Capacity is shown with the measure its source uses, and campuses without a published figure are marked "Capacity not published".

Records come from operators' own pages and announcements, city and prefecture releases, cable owners' pages and the announcement of Japan's GX strategic regions by the Ministry of Economy, Trade and Industry (METI) on 11 September 2026. Where two sources disagree, the map uses the operator's own current page and gives the other figure, with its source, in the site's details.

Most campuses are placed at the town their operator names, not at the exact site, and are marked "Location approximate". Cloud regions are left off because their providers do not say where their buildings are. Cable routes are straight dashed lines between landing points: they show what each cable connects, not its path on the seabed.

Map researched and maintained by CertifiedStrategic.com.

Government data centre regions: Ministry of Economy, Trade and Industry (METI), GX strategic regions, 11 September 2026. Campus and cable records: each operator's or owner's own pages, linked from each record. Base map: OpenFreeMap, OpenMapTiles, OpenStreetMap contributors.

Related Analysis

Japan's data centres: 3.8GW live, US$8bn AirTrunk bet

AirTrunk plans up to US$30bn for Japan

Goodman signs 20-year Tokyo lease behind an eight-to-ten-year grid wait

NEXTDC's A$8.4 billion liquidity underpins four-city Asia data centre pipeline after KL1