Certified Strategic
Perth (City Beach)
Perth: City Beach Landing SMAP Landing Station Connected DCs Equinix PE2/PE3, NextDC P1/P2 Cable SMAP (SUBCO) Fibre Pairs 16 Capacity 400+ Tb/s
Published infrastructure records
1 records in this collection.
| Infrastructure | Operator | State | Status | Source |
|---|---|---|---|---|
| Perth (City Beach) | SUBCO | WA | Operational | Source |
Perth: City Beach Landing SMAP Landing Station Connected DCs Equinix PE2/PE3, NextDC P1/P2 Cable SMAP (SUBCO) Fibre Pairs 16 Capacity 400+ Tb/s