Hume Campus Two
CDC's second Hume campus, on Tralee Street, with two data centres: HU4 and HU5. CDC gives 51MW of current operating capacity for the campus as a whole, not per building. Nearby Hume Campus 3 is not on the map: W.Media reports early plans of 576MW and says the short environmental pathway was rejected, so a full environmental impact statement is needed.
Published infrastructure records
1 records in this collection.
| Infrastructure | Operator | State | Status | Source |
|---|---|---|---|---|
| Hume Campus Two | CDC Data Centres | ACT | Operational | Source |
CDC's second Hume campus, on Tralee Street, with two data centres: HU4 and HU5. CDC gives 51MW of current operating capacity for the campus as a whole, not per building. Nearby Hume Campus 3 is not on the map: W.Media reports early plans of 576MW and says the short environmental pathway was rejected, so a full environmental impact statement is needed.