Beard Campus

CDC's newest Canberra campus, at 23 Tantalum Street, Beard. Beard 1 (BE1), two storeys with 10 data halls, is under construction, as CDC's own page says. Total capacity 39MW is CDC's campus figure. Beard 2 is planned: the ACT approved it with conditions on 29 September 2026 (DA 202645149), a three-storey building with 12 data halls, at 84MW as reported by W.Media.

Published infrastructure records

1 records in this collection.

InfrastructureOperatorStateStatusSource
Beard CampusCDC Data CentresACTConstructionSource

CDC's newest Canberra campus, at 23 Tantalum Street, Beard. Beard 1 (BE1), two storeys with 10 data halls, is under construction, as CDC's own page says. Total capacity 39MW is CDC's campus figure. Beard 2 is planned: the ACT approved it with conditions on 29 September 2026 (DA 202645149), a three-storey building with 12 data halls, at 84MW as reported by W.Media.